Retrofit and Upgrade of Non-Compliant Wastewater Treatment Systems

Is your effluent exceeding discharge standards, or is your system overloaded or deteriorating? Nanoen surveys the plant, pinpoints the root cause and proposes a retrofit plan that makes the most of existing structures while minimising production downtime.

  • Pinpoint the real cause of non-compliance
  • Reuse existing infrastructure
  • Construction with minimal production downtime
  • Committed effluent quality
Retrofit and Upgrade of Non-Compliant Wastewater Treatment Systems Site survey & advicefree initial consultation

Common challenges for businesses

If you are facing any of the situations below, Nanoen can help.

Monitoring results exceed standards

Parameters such as COD, BOD, ammonium, total nitrogen and total phosphorus fail to meet discharge standards (QCVN).

System overload

Flow and pollutant loads have increased with production expansion, and the existing system can no longer cope.

Poor biomass, odour

Biological sludge dies off, foams and generates odour; chemical consumption is high but treatment efficiency is low.

Deteriorated equipment and tanks

Pumps, air blowers and pipework are damaged, while the standards set in the permit are stricter than before.

Who this service is for

  • Factories with non-compliant monitoring results, or that have received warnings or penalties
  • Facilities that have increased capacity or changed products, altering wastewater characteristics
  • Systems that have been in operation for many years and need upgrading
  • Facilities preparing to apply for or amend an Environmental Permit

Serving businesses in Hanoi, Bac Ninh, Hung Yen, Hai Phong, Ninh Binh, Phu Tho and neighbouring provinces.

Scope of work

  • Condition survey and sampling at each treatment stage to assess treatment performance
  • Root-cause analysis: pollutant load, technology, equipment and operating practices
  • Retrofit proposal with cost estimate and schedule
  • Design, construction and installation of the required additional items
  • Microbial culture seeding, commissioning and fine-tuning until compliance is achieved
  • Handover, operator training and support updating environmental documentation

How Nanoen works

Survey → assessment → proposal → implementation → acceptance & handover. Every step has a clear deliverable you can track.

  1. 01

    Survey

    Inspect the system and sample wastewater at each treatment stage.

  2. 02

    Assessment

    Identify the root cause of non-compliant effluent.

  3. 03

    Proposal

    Retrofit plan, cost estimate, schedule and effluent quality commitment.

  4. 04

    Implementation

    Phased retrofit works to minimise disruption to production.

  5. 05

    Acceptance

    Commissioning, sampling and evaluation, handover and operator training.

Capabilities and completed projects

Photos from projects Nanoen has consulted on, designed and built.

  • Since 2020working in the environmental sector
  • 3 officesHanoi · Can Tho · Ho Chi Minh City
  • Engineers & specialistsenvironmental compliance and engineering
  • From consulting to constructionone partner from permits to plant
Construction and technology installation of a domestic wastewater treatment system
Construction and technology installation of a domestic wastewater treatment system
Wastewater treatment system for an animal feed and veterinary medicine plant
Wastewater treatment system for an animal feed and veterinary medicine plant
Wastewater treatment system for a paper mill
Wastewater treatment system for a paper mill
Biological rotating drum technology treating wastewater from washing finished mangoes
Biological rotating drum technology treating wastewater from washing finished mangoes
Construction and installation of a domestic wastewater treatment system
Construction and installation of a domestic wastewater treatment system

Frequently asked questions

Does the entire system have to be rebuilt?

Not necessarily. In many cases the existing tanks and equipment can be reused, with only some treatment stages added or modified. A solution is proposed only after an on-site survey and actual sampling.

Do we have to stop production during the retrofit?

Nanoen prioritises phased construction, temporary treatment arrangements, or carrying out works when the plant is running at reduced load, to minimise disruption to production.

How long until the effluent is compliant again?

It depends on the scope of the retrofit and the time needed to establish the microbial culture. A specific schedule is set out in the proposal before work begins.

Will environmental documentation need to be redone after the retrofit?

If the treatment works differ from what was licensed, the company may need to amend its Environmental Permit. Nanoen reviews the situation and advises on the related procedures.

Book a Site Survey

Leave your details and a Nanoen engineer will contact you about Wastewater System Retrofit.

Our offices

  • HanoiSố 52 TT6 Khu đô thị Văn Phú, phường Phúc La, Hà Đông, Hà Nội
  • Can Tho661E/29 Võ Văn Kiệt, KV Bình Yên A, P. Long Hòa, Q. Bình Thủy, TP. Cần Thơ
  • Ho Chi Minh City533/12/7 Phạm Văn Bạch, P.15, Q. Tân Bình, TP. Hồ Chí Minh

Book a Site Survey

Leave your details and we will get back to you as soon as possible.

Office locations

Hanoi office

Số 52 TT6 Khu đô thị Văn Phú, phường Phúc La, Hà Đông, Hà Nội

0986 689 781

Get directions
Call 0986 689 781 Zalo Chat Zalo
Call now Zalo Enquiry